• Suppliers
Whistleblowing/Segnalazioni
  • Italiano Italiano
    • IT – Policy del Gruppo Trevi
    • IT – Procedura operativa
    • IT – Segnalazioni tramite Lettera/Email
    • Whistleblowing
  • English English
    • EN – Trevi Group Policy
    • EN – Operating Procedure
    • EN – REPORTING BY LETTER/MAIL
    • Whistleblowing
  • Espanol Espanol
    • ES – Polìtica del Grupo Trevi
    • ES – Procedimiento Operativo
    • ES – informar por carta/correo
    • Whistleblowing
Soilmec EN
  • Corporate
  • Contacts
  • Products
  • Technologies
  • Training
  • Service & Spare Parts
  • Sustainability
  • Media
  • Suppliers

Press enter to search or escape to exit

Home / News / Soilmec new generation rigs at work on the banks of the Thames
  • Press Coverage
  • News
  • Events
  • Media Gallery

Soilmec new generation rigs at work on the banks of the Thames

Two new generation Soilmec rigs, an SR-90 and an SR-75, are currently working on an important urban renewal project in the prestigious district of Chelsea, London.

The project involves the redevelopment of a large site close to the Thames where new residential and commercial properties with underground parking over two levels will be built.

The foundations consist of a diaphragm wall along the outer boundary of the whole area, constructed with bored secant piles. More specifically, there will be 1,565 piles with diameters of 620,750, 900 and 1,200 mm at a depth of 15 – 20 metres. A number of 1,500 mm diameter piles will be installed at a depth of 40 metres under the most important buildings.

Previous Next
Contact Us
Headquarters:

Via Dismano, 5819

47522 Cesena (Forlì Cesena) Italy


Phone:
Phone +39 0547 319111

Fax +39 0547 318548

Follow us on
  • x
  • Network
  • Foundations Technology Academy
  • Controls and risks
  • Soilmec Journal
  • Disclaimer
  • Sitemap
  • Careers
  • TreviGroup
© 2025 Soilmec S.p.A. . VAT no. 00139200406
  • Privacy Policy
  • Terms of Use